Meeting Notes: Oct 05 2006

From Gallery Codex

Project Tasks

Gallery 2.2

  • Feature frozed, now doing bug/security fixes
    • (jablko/bharat) webdav - will be reviewed/added soon (making feature-freeze exception for this one)
    • (virshu/mindless) usability #1 - decided we don't want to change header/sidebar, but don't know CSS to make it work without this change
    • (bharat) Security audit for DP is lined up, will send diffs when ready
    • (all) read -core about security audit, provide feedback, help with fixes
  • Task/bug priority.. P9==fix for RC-1, P8==fix for 2.2, P7==nice-to-have

Theme contest

  • No update this week

Docs

  • ckdake: no word back from other schools, but we shoudl be able to get some people working on docs if we can come up with proposals for things for them to do

G2 Usability

  • No update this week

Gallery Foundation

  • Some work needed for routing donations: now accepting via paypal and clickandpledge.com; can we get SPI to receive directly via paypal/google checkout? (schultmc/bharat)

GMC search

  • No updates this week
    • Signe revived this topic in email, hopefully he'll continue to push it forward
    • search currently offline (except for privileged users), with form to search via google instead
    • could change DB table engine from MyISAM to InnoDB and see if that helps, also with one-table-per-file setting
    • could rollback drupal caching "fix" which greatly increases load on GMC because everytime people click "back" it hits the server to reload the page; this means "click search result, click back, click another search results" makes GMC repeat the search query (it was this drupal upgrade, and not the original 4.7 upgrade, when GMC lockups became much more frequent)

General Action Items

  • Jens to arrange a full security audit for 1.6
  • Jens/Christian/Dave to publish a test plan for 1.x
  • Need somebody to draft a proposal for an ISP qualification program
  • Bharat/Chris will present a primary transition plan including a job title (bharat to review draft from chris)
  • Chris will make sure that we set up a tech writer recruiting program (tracked above in Docs section)
  • Bharat will add anchors to download page so that the [version download] links on the main gmc page.

Other